NASA has verified that it has completed mounding the Orion spacecraft aboard the Space Launch System rocket that will push it into route in the future. With the mounding of the rocket complete, it’s ready to be transferred to the helipad for its long-awaited trip into route. Along with the completion of mounding the rocket, NASA has also now verified a implicit launch date for the uncrewed Artemis I charge NASA is presently targeting takeoff for February 2022. Still, before the launch can be, NASA does have to go through a series of integrated tests to complete the checkout for the system. While there’s still some testing to go, NASA Exploration Ground Systems program director Mike Bolger says the completion of mounding Orion atop the SLS rocket is a significant corner.
Several test juggernauts must be completed between now and that implicit February launch date. One of the juggernauts is Interface Verification Testing, designed to corroborate the functionality and interoperability of the interface across all rudiments of the rocket and the Orion capsule. Another test crusade is Program Specific Engineering Testing to insure colorful systems aboard the rocket and capsule function as intended NASA also has to conduct End-to- end Dispatches Testing, a testing program for the intertwined radio frequentness between charge control to the SLS, ICPS, and Orion. Those dispatches are critical to icing dispatches between the rocket during the first many seconds of launch and as it travels into route.
One of the most critical test juggernauts for the rocket is the Wet Dress Rehearsal. During that test crusade, the cryogenic energies will be loaded into the rocket as it prepares for simulated launch. For this test, the spacecraft and rocket will be rolled to the helipad to be prepared for energy and colorful checkouts. During that test program, charge regulators will run a simulated launch that stops before the machines would fire during the real launch
.